Tag Archives: streetscape project. Miami Beach

Venetian Causeway streetscape plan includes extensive, island-to-island upgrades

An overview of work on DiLido Island.

After a series of snags and delays, a series of construction and beautification projects on the Venetian Causeway and causeway islands by Miami-Dade County and the city of Miami Beach are nearing the go-ahead stage.

The scope of the work is daunting and will touch every homeowner living on the causeway — and affect every driver crossing it.

Along the causeway itself, it includes repaving the road and replacing all curbs, gutters, sidewalks, adding decorative crosswalks at intersections, landscaping medians and swale areas, improving bike lanes and re-doing all the lighting.

Light pole detail from Miami Beach's island streetscape plans

On the individual islands, the rehab is equally extensive — from new sidewalks to lighting and landscaping and drainage. (On Belle Isle, work on Island Avenue was done two years ago as part of the renovation of Belle Isle Park).

Miami Beach is handling the work on San Marino, DiLido and Rivo Alto islands. Plans are 90 percent complete, and the engineering firm developing them for the city — Schwebke, Shiskin & Associates — has made them available on the web so homeowners can study how their individual lot will be affected — even where the trees and light posts would be located. The plans are hundreds of pages, and take a long time to download. Belle Isle Blog pulled the art with this blog post from the site.

The Miami-Dade County piece of this project involves the repaving main causeway throughfare and renovating the right-of-way along the way. opens bids on June 30, with a targeted cost of nearly $7.8 million. According to the county summary, it includes sidewalks, curbs, gutters, landscaped medians, wider bike lanes, drainage improvements, decorative crosswalks, lighting, tree planting and signage from Biscayne to Belle islands. Continue reading