Get ready for continuing construction at Belle Isle’s doorstep

Rendering of proposed Marriott hotel

Rendering of proposed Marriott hotel

A Marriott Residence Inn on 17th Street. A West Avenue bridge over the Collins Canal. A streetscape project in Sunset Harbour.

If you think the maze of detours and clamor of construction equipment just east of Belle Isle will end with the completion of the Alton Road project  (and the Venetian Isles streetscape), think again.

There’s a series of new projects in the queue, Belle Isle residents learned  Wednesday night at a meeting at the Belle Plaza condominium.  Belle Isle Residents Association President Scott Diffenderfer gave this overview:

residence-inn-site

The lot is the triangle shape northwest of the A

The Marriott Residence Inn the city approved last spring for the pie-shaped property at West Avenue between 17th Street and the Collins Canal is in the process of being permitted by the city, and work could begin in a month or two. The city approved a 116-room hotel designed by architect Kobi Karp for the site.

Commissioners chose this configuration for the bridge.

The city chose this configuration for the bridge.

– Design work on the proposed West Avenue Bridge, which would cross the Collins Canal and link Sunset Harbour with the West Avenue area near Epicure, is moving forward, though construction won’t begin until the Alton Road project is complete.

The city commission approved construction of the bridge in April 2012. The bridge will include one northbound lane and two southbound lanes, one of them for cars turning left on to 17th Street from Sunset Harbour. There will be a sidewalk and bike path in each direction.

– The city is preparing documents to enable bidding for a streetscape  project in Sunset Harbour that will include solving the flooding problem and installing new sidewalks, lighting and landscaping. Bids will be sought this summer.

Belle Isle residents received updates on a variety of other issues:

– Alton Road reconstruction. The city and the Florida Department of Transportation are trying to get the project finished by December 2014, seven months earlier than projected, by working longer hours Belle Isle residents will get updates on a variety of public and private construction projects on and around our island when the Residents Association meets Tuesday night.
Among the items on the agenda:
– We’ll learn the latest timetable for switching the toll collection on the Veneitan Causeway to Sunpass, and how that may affect annual pass renewals, which happen each May.
– The Florida Department of Transportation will provide an update on the Alton Road construction project, which has disrupted traffic throught the east side of Miami Beach.
– The city will report on the sulphur odor on Belle Isle and around the park, as well as the park landscaping.
– The city will explain the delays on the Collins Canal bikepath, a partially completed project that was due to be complete last year. The pathway is mostly done, but lighting and landscaping are not.
– We’re get a report on the Sunset Harbour pumping station project, designed to reduce flooding in that neighborhood.
– The Belle Isle Residents Association will update several development projects near us — the 17th Street Marriott Residence Inn, proposed apartment on Belle Isle at the Belle Isle Key apartment location and a proposed parking expansion and renovation at The Standard.

The meeting happens at Belle Plaza, 20 Island Ave. There is a meet and greet at 6 p.m. and the meeting is scheduled to begin at 7 p.m.

Sent from my iPad on construction. FDOT representative Enrique Tamayo told homeowners that FDOT will try to minimize the impact on neighborhoods, but a major project like this is very disruptive.

Venetian Causeway conversion to SunPass. This is expected to happen in late summer. Venetian Island property owners with C-Pass transponders will be contacted so they can register their SunPass devices to work properly on at the toll plaza. We’ll still pay an annual $24 fee; other causeway users will be charged a toll each time on their SunPass. There will no longer be toll takers at the plaza.

The city has switched from iPark devices to a PaybyPhone, a smartphone app to allows you to charge metered parking to a credit card. The new app will be in service in a month or so.

– Proposed Standard Hotel renovation and new parking structure. This idea, floated by the hotel in January 2013, isn’t being pushed by the owners. They received a lukewarm reception from the neighborhood last year, and haven’t submitted a formal proposal to the city.

About these ads

3 responses to “Get ready for continuing construction at Belle Isle’s doorstep

  1. The rendering of the Marriot Hotel (A) site is off the described location.According to rendering (A) Hotel Site would be on south corner of Alton and 17th, next to American Plumbing. The real site as described is the empty lot (17th street) backed by canal on north side and across from parking lot of Epicure.

  2. Was this meeting last night or is it tonight?

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s